Elements Europe Complete 12th Premier Inn Install
Elements Europe has completed the install of 131 Bathroom Pods at what will be Slough’s new Premier Inn hotel.
This is the 12th Premier Inn Elements Europe can add to its portfolio, with the 13th now in manufacture for a new Premier Inn in South Bromley.
Working with main contractor Bowmer Kirkland for the 3rd time on a Premier Inn project, Elements Europe executed the install to Bowmer Kirkland’s critical path.
The Bathroom Pods have been manufactured to Premier Inn’s ID4 specification, the latest design specification for the brand.