Premier Inn Yeovil Opens its Doors
Premier Inn has expanded its portfolio in the South West with the opening of its Yeovil city centre hotel.
Elements Europe supplied 80 bathroom pods to the brand new Premier Inn. All modules were manufactured to ID4 specification, the newest bathroom design Whitbread Plc has introduced to its Premier Inn brand.
Elements Europe has manufactured both bathroom pods and modules to a number of Premier Inn hotels in the past. However this is the first project they have manufactured to the ID4 specification which boasts a brighter more modern design with large purple landscape tiles, silver grout and other smaller adaptations to enhance the look and feel of the bathroom.
“Our teams strive to achieve the exacting standards Whitbread Plc require for their brand, and always look forward to seeing the latest Premier Inn style.” Commented Russell Parry, Factory Manager.
Four of the bathroom pods were accessible pods featuring baths or showers. These were especially adapted throughout to ensure the comfortable stay of those with access problems.
Bowmer and Kirkland were the main contractor on the project. This is not the first time Elements Europe has collaborated with Bowmer and Kirkland on Premier Inn projects having worked previously on Premier Inn Wandsworth and Croydon.