The First of 695 Pods to be Installed in December
December, January and February are set to be busy months for Elements Europe’s installation teams with over 695 pods being delivered.
A combination of bathroom pods and room modules will be installed to Hathersage Road, Motel One in Manchester, and for Premier Inn South Bromley and Slough.
“We are currently manufacturing for a range of hotel and private rented sector projects. The beauty of modular construction is the speed at which we can deliver” commented Glen Davies Director at Elements Europe
“Unlike traditional construction winter doesn’t prove to be a problem for off-site construction as the majority of work is done in a factory environment eliminating the problem of bad weather.” Added Davies
Elements Europe’s team takes responsibility all the way from design to delivery, collaborating closely with our clients, architects and on-site contractors enabling a seamless process from our works in the factory to our delivery on-site.